We are very new to 3D Scan with Skydio 2+ and are testing scenarios before putting in for an X series in a grant proposal.
One of the batteries during a 3D Scan of an indoor training center went from 50% to 30% very quickly and then the Enterprise app prompted for a battery swap. But on landing there was only about 10% left which drained to 5% before the post processing was completed. Now we won't use that battery again, but if this happens again, once the Skydio 2+ lands, can we attach a USB charging cable with external battery pack to keep the battery from draining to 0 before post-processing is completed?
One of the batteries during a 3D Scan of an indoor training center went from 50% to 30% very quickly and then the Enterprise app prompted for a battery swap. But on landing there was only about 10% left which drained to 5% before the post processing was completed. Now we won't use that battery again, but if this happens again, once the Skydio 2+ lands, can we attach a USB charging cable with external battery pack to keep the battery from draining to 0 before post-processing is completed?